WEGC campus from Mount Victoria…

The picture was taken recently. My office area and classrooms are now on the top field. Similar to being sent to Siberia, except I actually prefer it on the top field teaching in conventional classrooms!

Quite a lot of work still going on…

  • remedial work on the new main block…
  • East block (wrapped up now) being gutted and new fit-out (asbestos)
  • Science block (wrapped up) new roof and eventually to be gutted…
  • South block (damp and smelling) to be sorted after the Esat and Science blocks
  • New entrance steps and car parks and driveways… being finished
  • Maon Hall – being painted…

Hope it all gets done by 27 January 2020…

This entry was posted in Uncategorized and tagged . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s